DIN 2510 Stud Bolts (Metric)

ASTM A193 Grade B7 Specifications

DIN 2510 Stud Bolts

DIN 2510 Form K Stud Bolts

Dimensions for DIN 2510 Stud Bolt

Size (d1) d2 d3 b2 z1 z2 SW
M12 8.5 8 13 1.75 4 7
M16 12 12 16 2 5 10
M20 15 14 20 2.5 6 11
M24 18 14 24 3 6 11
M27 20.5 18 27 3 6 13
M30 23 18 30 3.5 6 13
M33 25.5 25 33 3.5 9 22
M36 27.5 25 36 4 9 22
M39 30.5 28 39 4 10 24
M42 32.5 28 42 4.5 10 24
M45 35.5 32 45 4.5 11 27
M48 37.5 32 48 5 11 27
M52 41 36 52 5 12 30
M56 44 40 56 5.5 13 32

How to specify DIN 2510 Stud Bolts (Metric)

A reliable enquiry defines the finished component, not only the material grade. State the governing dimensional standard, nominal diameter, thread form and pitch, length convention, quantity, surface finish and required delivery condition. Include a drawing when a standard leaves more than one configuration open or when ends, points, drilled features, reduced shanks or non-standard thread lengths are involved.

Material and service

Confirm the specified B7 material grade, the design temperature and pressure context, and any project material specification. Identify the compatible nut and washer grades. If sour, low-temperature or other special service applies, the responsible engineer should approve the material and supplementary requirements.

Dimensions and finish

Name the dimensional standard and revision, thread class or tolerance, and whether dimensions are checked before or after coating. A coating can affect thread fit and friction, so specify the complete coating system, lubricant condition and mating parts together.

Inspection documents

State the certificate type, heat and manufacturing-lot traceability, marking, mechanical tests, chemical analysis and any dimensional or nondestructive examination reports. Additional testing must be invoked before production with its method, sampling and acceptance criteria.

Pre-order review

For related decisions, review the material specification, mechanical properties, coating guide, thread guide and testing and certification guide. Technical values should always be verified against the current governing standard and approved project documents.